Case Study Ro Plant Membrane Optimisation
SITUATION
A leading Kenyan producer of high-quality Roses flower farm, with a total installed capacity of 100 m3/hr. reverse osmosis Plant, experienced tremendous down time in operation of the RO Plant due to
- Frequent Membrane CIP Cleaning
- Reduced Membrane permeate flux.
- High energy & Power Consumption due to long operating pumping hours of the plant to meet water demand due to clogged, blocked, or fouled membranes.
HYDROLINK – BIMAKS SOLUTION
Hydrolink carried out an